Groundwater Withdrawal Groundwater Withdrawal Request

This service enables businesses to obtain a permit for the extraction of groundwater generated from excavation activities and its discharge into the Department's stormwater drainage network.

Required Documents

    Business

  • NOC ,No Objection Certificate

  • site plan

  • groundwater withdrawal letter from customer

  • A copy of the follow-up card for the installation of a groundwater drainage pipe

  • In the event of a request to use a vehicle to extract groundwater, a valid copy of the tanker’s ownership from both sides, issued by the Emirate of Ajman, shall be added.

  • In the event of requesting a permit for an earth berm to collect water, a copy of the approval of the Planning and Survey Department for the plot of land on which the berm will be implemented in addition to the approval of the Investment Administration

  • Commercial license of the executing company (groundwater drainage company), issued by the Emirate of Ajman

Process

  • 1 Log in to the AjmanOne App using UAE PASS
  • 2 Submit the application and attach the required documents.
  • 3 Pay the applicable fees
  • 4 Receive the groundwater extraction permit
  • 5 Submit a request for completion of work

Service fees

  • Security Deposit for a Seawater Discharge Permit Fees - AED 10000

  • Fees for a Seawater Discharge Permit (Per Day) - AED 100

  • Security Deposit for a Water Discharge Permit to a Manhole Not Connected to a Pumping Station - AED 5000

  • Fees for a Water Discharge Permit to a Manhole Not Connected to a Pumping Station (Per Pump, Per Day) - AED 200

  • Security Deposit for a Water Discharge Permit to a Manhole Connected to a Pumping Station - AED 30000

  • Fees for a Water Discharge Permit to a Manhole Connected to a Pumping Station (Per Pump, Per Day) - AED 500

  • Security Deposit for Water Collection Within an Earthen Berm - AED 10000

  • Fees for Using an Existing Culvert (Per Day) - AED 50

  • Security Deposit for a Water Tanker Permit (10,000-Gallon Capacity) - AED 10000

  • Fees for a Water Tanker Permit (10,000-Gallon Capacity) (Per Month) - AED 4000

  • Security Deposit for a Water Tanker Permit (5,000-Gallon Capacity) - AED 5000

  • Fees for a Water Tanker Permit (5,000-Gallon Capacity) (Per Month) - AED 3000

  • Security Deposit for a Water Tanker Permit (1,000-Gallon Capacity) - AED 3000

  • Fees for a Water Tanker Permit (1,000-Gallon Capacity) (Per Month) - AED 1500

  • Penalty for Failure to Renew a Manhole Usage Permit (Per Day) - AED 400

Service Duration

  • 1 Days